We were contacted by a local school to carry out a staffroom refurbishment over the Christmas holidays with 2 weeks notice.
The project was to update the tired looking kitchen with a new one while also making it more user friendly for the staff. We worked closely with Howdens to provide a design that worked for the school giving them additional water boiler, sink and more cupboard/ worktop space so more staff could use at once while also making sure all products were available in the required timeframe
Flooring was removed, prepared and replaced with new anti slip flooring from Polyflor to give the area a modern feel while meeting the daily requirements of spillages etc
A new coloured splashback from Altro Whiterock finished off the kitchen area and tied it into the clients existing furniture colour
The client was very impressed by both quick turn around and high level of finish, and since we have carried out several more projects at the school
Service Disciplines
- Electrical
- Partitioning
- Glazed Partitioning
- Flooring
- Networking
- Plumbing
- Suspended Ceilings
- Furniture
- Decoration